John Red Bartlett
assembly for windmill
lifting tower segments
3900W
111, 80 tons and full main boom is 190' jib is 230'
another assembly for a windmill
4x00 ringer
self erect 16000 with BRS, builds the housing and adds the tracks and boom base. 440 ton
setting tower base and unloading nacelle, with a short boom it can travel. 999 275 ton
4100 on a barge
building tower and add the nacelle on top
lifting nacelle in the distance
s Walsh crawler building a Walsh 4100 ringer on a barge for the Louisville bridge
Kobelco 10000 being assembled for windmill work
16000 booming up with an attachment that is a telescoping "dump truck" style hydraulic ram to assist getting a long boom in the air. No assist crane needed. Some boom bending. The ram just assists, the boom hoist still does most of the work. Asked a question about "pennant bars."
999 unloading windmill parts
No comments:
Post a Comment