Saturday, March 24, 2018

Crane Postings


John Red Bartlett


assembly for windmill

lifting tower segments

3900W

111, 80 tons and full main boom is 190'    jib is 230'

another assembly for a windmill

4x00 ringer

self erect 16000 with BRS, builds the housing and adds the tracks and boom base. 440 ton

setting tower base and unloading nacelle, with a short boom it can travel. 999 275 ton

4100 on a barge

building tower and add the nacelle on top

lifting nacelle in the distance

s Walsh crawler building a Walsh 4100 ringer on a barge for the Louisville bridge

Kobelco 10000 being assembled for windmill work

16000 booming up with an attachment that is a telescoping "dump truck" style hydraulic ram to  assist getting a long boom in the air. No assist crane needed. Some boom bending. The ram just assists, the boom hoist still does most of the work.    Asked a question about "pennant bars."

999 unloading windmill parts



No comments:

Post a Comment